Civil and construction works

From backfill and grading to final handover

Earth backfilling and compaction, structural foundations, security walls and fencing, ready-made and site-built buildings, caravan manufacturing and installation, water, sewage and irrigation networks, roads and paving. We delivered eight model schools in Basra between 2023 and 2024, handed over complete with their systems.

We reply Sunday – Thursday, 8:00 – 16:00 Baghdad time

What we execute

Our civil and construction work covers a project from raw ground to a working facility. We take the site, backfill and compact, execute foundations and structure, lay water, sewage and drainage networks, and pave roads and footpathsthen hand over with working systems, not a shell waiting on another contractor.

The practical difference is that the scope isn't split. When the network, compaction and paving are executed under one contract, there's no dispute about who owns it when the paving settles over a trench six months later.

Scope of work

  • Earth backfilling, compaction and site grading
  • Structural foundations and footings
  • Security walls and perimeter fencing
  • Ready-made and site-built buildings
  • Caravan manufacturing and installation
  • Water, sanitation and irrigation systems
  • Roads, footpaths and paving

Projects delivered with this service

Why us on this line specifically?

  • A documented record in educational buildings

    Eight model schools in Basra between 2023 and 2024in Al-Sadiq, Qurna and the city centreall handed over usable with HVAC and drainage, not as shells.

  • Network, backfill and paving under one responsibility

    In Ajaydin and Hay Al-Hakim (2023) we executed the network, compaction and paving within a single scope. Splitting the work between two parties is the cause of settlement problems, not their consequence.

  • Foundations designed for the site

    In Qurna, foundations were designed for the soil at the TigrisEuphrates confluence, not copied from another project's detail. A foundation design error doesn't show at handoverit shows years later.

What we need from you to prepare a quote

  1. 1Type and scope of work (backfill / foundations / structure / roads / networks)
  2. 2Project locationgovernorate and district
  3. 3Estimated quantities, or the BOQ if available
  4. 4The reference specification, if the contract names one
  5. 5Expected start date and required duration

Send us the scope for Civil and construction works

Give us the items listed above, and we'll come back with a proposal covering specifications, schedule and price.