Three integrated model schools in Qurna district, executed in partnership with Chinese firms to modern engineering and educational standards, with reinforced concrete skeletons and foundations designed for marshland soil conditions.

Project data

Location
Qurna district, north Basra
Completion year
2023
Status
Completed and handed over
Buildings
3 schools
Structural system
Reinforced concrete skeleton
Foundations
Designed for local soil conditions
Delivery
In partnership with Chinese firms
Completion certificate
Available on request

The completion certificate is available on request for prequalification purposes.

Site photography

Architectural illustration of a modern reinforced-concrete model-school complexIllustration

Illustration of a model school of this project's type

An architectural illustration, not a photograph of the actual project. The verifiable reference for this project is its completion certificate, available on request.

The documented record

Site photographs for this project are still being gathered from the archive. In the meantime the reference that actually settles a prequalification is the stamped completion certificate — a verifiable document, not an image — and it is available on request.

Completion year
2023
Status
Completed and handed over
Completion certificate
Available on request

The challenge

Qurna sits at the confluence of the Tigris and Euphrates, and its soil differs fundamentally from that of central Basra. Foundations that work elsewhere do not work here — and a foundation design error doesn't show at handover, it shows years later.

The approach

  • Foundations were designed for the area's specific soil conditions, not copied from another project's foundation detail.

  • The reinforced concrete skeletons were executed in partnership with Chinese firms to approved engineering standards.

  • The architectural design followed modern educational standards, serving how the school is actually used rather than only how it looks.

The outcome

All three schools were handed over in 2023, ready for use — an investment in the future of Qurna's next generation.

Request this project's completion certificate

We send this project's completion certificate on request for prequalification purposes. And if you have a project of similar scope, send us the bill of quantities or a scope description and we'll come back with a proposal covering specifications, schedule and price.

We reply Sunday – Thursday, 8:00 – 16:00 Baghdad time

Related projects